Friday 16th November 2007

I’ve just had the DEC assembly off the EQ-6 following instructions on James Robert Cook’s site. This is where I found the instructions for the RA axis when I regreased that so I was happy to return here for help.

I packed the tapered bearing with grease and regreased the worm. Putting everything back together had me concerned when the bearing near the head of the mount refused to go back into its seat. I eventually tapped it home, very gently, with a small hammer and a rag. My concern was that the casting would crack but I couldn’t see why the bearing would come out so easily then fail to go back in. I know you need to have everything square as it’s a tight fit but like I say, a bit of a scary moment there.

All fitted back together nicely and adjusted the mesh with the power on so that I could make sure everything turned. Adjusting the mesh control grub screws allowed me to take the slack out of the axis and now I’m ready for the next clear night.

After adjusting the RA axis I had a few re-adjustment sessions before I was happy with the mesh, I think I learned from that but I’m still prepared for some fine tuning with the mount under load. A wise man would tell you to take the electronics out, remove the stepper motors and test the mesh with your finger but I like to familliarize myself with the mount a little at a time and had no intention of stripping the whole thing down.

Start to finish was no more than 1 hour, but I didn’t chemically degreased the gears or remove the smaller bearings, I was only interested in making sure there was little or no play in the axis, others will go further and suggest replacing the bearings, but I’m hoping that’s not required at the moment.

Job Done

Leave a Reply